Case Study: Hill-Rom UK, Leicestershire

Job Description:

Our Client:

Hill-Rom, is a leading provider of medical technologies for the health care industry including hospital beds, patient lifts, and non-invasive therapeutic products.

Job discription:

Phase 1 - Full refurb of the ground floor office area which included dado trunking and modular LED lighting with occupancy sensors, reducing the power consumption of the existing office by 55%

Phase 2 - Creation of new meeting rooms all with floor & wall sockets, LED modular lights switched by occupancy sensors.

Phase 3 - New Showroom, again including LED modular lighting, dado sockets, 3 new aircon units and supplies for HillRoms demonstration hoists and lift

Phase 4 - Changing all the 1st floor offices to LED modular lights with occupancy sensors

It is estimated that the building will now have reduced Energy consumption by 45% per year, saving approximently £1500

Phase 5 - Electrical Installation Condition Report (EICR), on the whole building which as standard, includes Infrared imaging of all Dis boards to identify any hot spots.

In association with

Image result for company image commercial interiors